Jiangsu Profile

Product List
3301. Fast-Drying Anti-Rust Coating for Industrial Steel Guards
[Jul 21, 2026]
[Jul 21, 2026] Product Description Parameter Result Mass solid content, % >=70 Specific gravity 1.5+0.2kg/m2 Suggested film thickness 50-80um (dry film) Theoretical dosage 7-8m2/kg (loss excluded) Surface drying time 0.5h(25°C) Full ...
3302. Fast-Drying Acrylic Alkyd Coating for Steel Protection
[Jul 21, 2026]
[Jul 21, 2026] Product Description Parameter Result Mass solid content, % >=70 Specific gravity 1.5+0.2kg/m2 Suggested film thickness 50-80um (dry film) Theoretical dosage 7-8m2/kg (loss excluded) Surface drying time 0.5h(25°C) Full ...
3303. Fast-Drying Industrial Steel Coating with Rust Protection
[Jul 21, 2026]
[Jul 21, 2026] Product Description Parameter Result Mass solid content, % >=70 Specific gravity 1.5+0.2kg/m2 Suggested film thickness 50-80um (dry film) Theoretical dosage 7-8m2/kg (loss excluded) Surface drying time 0.5h(25°C) Full ...
3304. Fast-Drying Steel Structure Coating with Anti-Rust Pigments
[Jul 21, 2026]
[Jul 21, 2026] Product Description Parameter Result Mass solid content, % >=70 Specific gravity 1.5+0.2kg/m2 Suggested film thickness 50-80um (dry film) Theoretical dosage 7-8m2/kg (loss excluded) Surface drying time 0.5h(25°C) Full ...
3305. Fast-Drying Anti-Rust Coating for Steel Roof Trusses
[Jul 21, 2026]
[Jul 21, 2026] Product Description Parameter Result Mass solid content, % >=70 Specific gravity 1.5+0.2kg/m2 Suggested film thickness 50-80um (dry film) Theoretical dosage 7-8m2/kg (loss excluded) Surface drying time 0.5h(25°C) Full ...
3306. Environmentally Safe Fast-Drying Anti-Rust Steel Coating
[Jul 21, 2026]
[Jul 21, 2026] Product Description Parameter Result Mass solid content, % >=70 Specific gravity 1.5+0.2kg/m2 Suggested film thickness 50-80um (dry film) Theoretical dosage 7-8m2/kg (loss excluded) Surface drying time 0.5h(25°C) Full ...
3307. Reflective Acrylic Coating for Non-Directive Road Markings
[Jul 21, 2026]
[Jul 21, 2026] Product Description Parameter Result Colour White, yellow Shine 40-50 Theoretical usage 5-6 m 2/ kg (based on 50 microns dry film, excluding loss) Specific weight approximately 1.4 Drying time Surface dry at 25 °Cs0.5 ...
3308. Quick Drying High Solid High Gloss High Flash Point Alkyd Protective Coating
[Jul 22, 2026]
[Jul 22, 2026] Construction Instructions 1. Use power tools or hand tools to stir thoroughly. Apply at 5 ° C to 40°C. 2. Application methods: airless spray, air spray, brush, roll. 3. Diluent: Exempted solvent, with an addition ratio ...
3309. General Purpose High Flash Point High Gloss High Solids Alkyd Coating
[Jul 22, 2026]
[Jul 22, 2026] Construction Instructions 1. Use power tools or hand tools to stir thoroughly. Apply at 5 ° C to 40°C. 2. Application methods: airless spray, air spray, brush, roll. 3. Diluent: Exempted solvent, with an addition ratio ...
3310. Non Hazardous High Flash Point High Solid High Gloss Alkyd Protective Coating
[Jul 22, 2026]
[Jul 22, 2026] Construction Instructions 1. Use power tools or hand tools to stir thoroughly. Apply at 5 ° C to 40°C. 2. Application methods: airless spray, air spray, brush, roll. 3. Diluent: Exempted solvent, with an addition ratio ...
3311. High Solid Low Voc Alkyd Industrial Coating for Indoor and Outdoor Use
[Jul 22, 2026]
[Jul 22, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
3312. High Flash Low Odor Alkyd Industrial Coating Outdoor Weather Resistance
[Jul 22, 2026]
[Jul 22, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
3313. Factory Direct High Solid High Gloss High Flash Point Alkyd Protective Coatings
[Jul 22, 2026]
[Jul 22, 2026] Construction Instructions 1. Use power tools or hand tools to stir thoroughly. Apply at 5 ° C to 40°C. 2. Application methods: airless spray, air spray, brush, roll. 3. Diluent: Exempted solvent, with an addition ratio ...
3314. Construction Industrial Alkyd Coating High Flash Point High Gloss High Solids
[Jul 22, 2026]
[Jul 22, 2026] Construction Instructions 1. Use power tools or hand tools to stir thoroughly. Apply at 5 ° C to 40°C. 2. Application methods: airless spray, air spray, brush, roll. 3. Diluent: Exempted solvent, with an addition ratio ...
3315. High Performance High Flash Point High Solid High Gloss Alkyd Protection Coating
[Jul 22, 2026]
[Jul 22, 2026] Construction Instructions 1. Use power tools or hand tools to stir thoroughly. Apply at 5 ° C to 40°C. 2. Application methods: airless spray, air spray, brush, roll. 3. Diluent: Exempted solvent, with an addition ratio ...



















