Jiangsu Profile

Product List
50551. Popular Excellent-Quality Multifunctional Construction Material Elevator Construction Shaft Beam ...
[Sep 11, 2025]

Product Description Shaft Beam Platform Shaft platform is mainly used for concrete casting of shaft of high-rise buildings, such as elevator, equipment shaft and stairwell. The lateral pressure of concrete is ...
50552. Lianggong Competitive Price Modular Steel Framed Wall Formwork for Construction
[Sep 05, 2025]

Lianggong Competitive Price Modular Steel Framed Wall Formwork for Construction Product Description Steel Frame Formwork System Steel frame formwork is made up of 12mm thick plywood covered with hollow steel. It is ...
50553. China Lianggong Concrete Slab Formwork with Drop Head Steel Frame Formwork with Early Stripping for ...
[Apr 10, 2025]

Lianggong Formwork Steel Frame Formwork Early Stripping slab formwork for high building Product Description T-Form System Item Model Dimention Area Unit weight (kg) T-Form ...
50554. Prefab Fully Furnished Prefabricated Portable Home Container House for Sale
[Apr 10, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
50555. 40 Foot Prefabricated Luxury Residential Container House
[Apr 10, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
50556. High End Manufacturing Office Dormitory Villa Flat Packaging 20FT Detachable Container Room
[Apr 10, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
50557. Portable Container House Economical and Practical Container Home House
[Apr 10, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
50558. Mobile Commercial Apartment, Floor Office, Steel Structure, Modular Container House, Family ...
[Apr 10, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
50559. Good Thermal Insulation Performance Good Flexibility H20 Timber Beam Wall Formwork for Wall ...
[Apr 09, 2025]

Timber Beam Formwork H20 Timber Beam Formwork includes steel walers, H20 timber beams, and other connecting components. Depending on the length of the H20 beam, which can be up to 6.0 m, these components can be joined ...
50560. Lianggong Durable Hight Turnover Adjustable Arced Formwork for Building Construction
[Apr 03, 2025]

Product Description Adjustable arced formwork Plywood is utilized for the panel of adjustable arced formwork, as it has a certain toughness and can be deformed without being damaged after applying an appropriate ...
50561. China Factory Manufacturer Construction H20 Timber Beam for Best Price
[Apr 03, 2025]

Product Description H20 Timber Beam Timber beam H20 is an important part of formwork system. It has a very wide range of application in Construction,Metro, Tunnel, Nuclear Power Station etc.as one of the basic ...
50562. Made in China Lianggong Reusable and Versatile Lightweight ABS Plastic Formwork for Wall and Slab
[Apr 02, 2025]

Product Description Plastic Formwork Plastic Formwork is a new material formwork system made from ABS and fiber glass. It is suitable to realize concrete columns, pillars, walls, plinths, and ...
50563. Lianggong High-Quality Steel Frame Formwork for Global Construction Needs
[Mar 26, 2025]

Lianggong High-Quality Steel Frame Formwork for Global Construction Needs Product Description Lianggong Steel Frame Formwork LG-SF 65,composed of formwork panel (steel frame lined with 12 mm plywood)and ...
50564. Container Office Steel Structure Frame Detachable Container House as Dormitory Office Building
[Mar 18, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
50565. Multi-Residential Area Convenient Prefab Modular House Hause Prefabricated Houses Modular Homes
[Mar 18, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
