Jiangsu Profile

Product List
84331. Hydraulic Self-Climbing Formwork System Construction Formwork for High Rise Buildings and Piers ...
[Dec 16, 2025]
[Dec 16, 2025] Product Description Hydraulic Auto-climbing Formwork The power of hydraulic climbing formwork comes from the hydraulic jacking system which contains a hydraulic oil cylinder and a vertical reversing box which can ...
84332. Lianggong Protection Screen and Loading Platform Safe system for Building Construction
[Dec 16, 2025]
[Dec 16, 2025] Product Description Auto Climbing Protection Screen for safety protection The climbing protection panel is enclosure for construction of high-rise buildings. It can enclose three floors one time. Through the ...
84333. Hydraulic Self-Climbing Formwork Scaffold System Professional Standard Construction
[Dec 16, 2025]
[Dec 16, 2025] Product Description Auto Climbing Protection Screen for safety protection The climbing protection panel is enclosure for construction of high-rise buildings. It can enclose three floors one time. Through the ...
84334. Portable Plastic Toilets Movable Low Cost Toilets Shower Public Bathrooms with Waste Tank
[Dec 11, 2025]
[Dec 11, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
84335. Hot Sale Outdoor Plastic Toilets Shower Room with Water Waste Tank Wholesale Toilets
[Dec 11, 2025]
[Dec 11, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
84336. Supplier Prefabricated Residential Housing Environmental Protection Modular Residential Housing ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
84337. Temporary Outdoor Prefabricated Houses for Family Gatherings Can Be Used for Temporary Rest, ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
84338. High Load Capacity Metal Telescopic Shoring Acrow Metal Scaffolding Adjustable Shuttering Jacks ...
[Jan 16, 2025]
[Jan 16, 2025] Scaffold Scaffolding Ringlock Upper Adjustable Shoring Post Log U Head Screw Base Jack Product Description Brand Name Rapid Place of Origin Wuxi, Jiangsu, China Material Standard Q235 Carbon steel Size X=500, ...
84339. Steel Forged Ladder Formwork Tube Pipe Scaffolding Beam Clamp
[Sep 13, 2024]
[Sep 13, 2024] Steel Forged Ladder Formwork Tube Pipe Scaffolding Beam Clamp Product Description Brand Name Rapid Place of Origin Wuxi, Jiangsu, China Descripstion Tube with end fitting Size 4", 6", 8", 10", 13" Model ...
84340. Best Price Forged Building Shuttering Pipe Scaffold Swivel Coupler Clamp
[Sep 13, 2024]
[Sep 13, 2024] Best Price Forged Building Shuttering Pipe Scaffold Swivel Coupler Clamp Product Description Brand Name Rapid Place of Origin Wuxi, Jiangsu, China Descripstion Tube with end fitting Size 4", 6", 8", 10", ...
84341. Reusable Fiber Glass Plastic Formwork (TP60)
[Nov 27, 2021]
[Nov 27, 2021] Reusable Fiber Glass Plastic Formwork (TP60) is a new material formwork system made from ABS and fiber glass. It provides project sites with convenient erection with light weight panels thus are very easy to handle. It ...
84342. European Standard Heavy Duty Steel Prop for Shoring
[Aug 25, 2021]
[Aug 25, 2021] European Standard Heavy Duty Steel Prop for Shoring as the most popolar prop serie among all TECON telescopic props, is designed and manufactured according to EN1065 standard. The sizes are available from 1500mm to ...
84343. High Flexibility H20 Timber Beam Slab Formwork
[Mar 09, 2026]
[Mar 09, 2026] High Flexibility H20 timber beam Slab Formwork Brief Introduction High Flexibility H20 timber beam Slab Formwork (TECON Slab Flex 20 Formwork) is the basic slab formwork mainly consisted by plywood, H20 timber ...
84344. China Construction Decking Formwork for Slab
[Mar 09, 2026]
[Mar 09, 2026] China Construction Decking Formwork for Slab Brief Introduction China Construction Decking Formwork for Slab (TECON Slab Flex 20 Formwork) is the basic slab formwork mainly consisted by plywood, H20 timber beam ...
84345. Building Material Concrete Formwork for Large Area Slab
[Mar 09, 2026]
[Mar 09, 2026] Building material concrete Formwork for Large Area Slab Brief Introduction TECON Slab Table Formwork is a highly efficient and convenient system for large and medium area slab project with few beams. They can be ...



















