Jiangsu Profile

Famous Export Brand

Product List
85831. Supplier 3D Customized Prefabricated Single-Layer Container Residential Houses, Movable Wood Color ...
[Apr 10, 2025]
[Apr 10, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
85832. Granny Flat 20FT 40 FT Container House Prefab Modern Villa Prefabricated Mobile Home 2 3 4 5 Bedroom
[Apr 10, 2025]
[Apr 10, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
85833. Wholesale 20FT 40FT Prefabricated Quick Assembly Houses with Roofs, Simple Mobile Houses, Temporary ...
[Mar 20, 2025]
[Mar 20, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
85834. Container House Movable Prefabricated House for Villa, Office, Public Toilet Container House Prefab ...
[Mar 18, 2025]
[Mar 18, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
85835. En74 Forged Pressed Scaffolding Coupler 90 Degree Right Angle Clamps Double Coupler Scaffold Fixed ...
[Sep 13, 2024]
[Sep 13, 2024] Best Price Forged Scaffold Building Shuttering Pipe Swivel Clamp Product Description Brand Name Rapid Place of Origin Wuxi, Jiangsu, China Descripstion Tube with end fitting Size 4", 6", 8", 10", 13" Model ...
85836. Flat Pack Large Container House Prefabricated Homes Sandwich Panel Detachable Container Homes ...
[Jul 02, 2024]
[Jul 02, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
85837. Steel Metal Tunnel Formwork for Slab and Wall Concrete in One Time Hotel Apartment Construction
[May 25, 2026]
[May 25, 2026] Steel Formwork System Introduction Steel Column Formwork has connected together with bolt. Steel Column Formwork for perfect concrete surfaces, so column formwork guarantees a perfect concrete surface ...
85838. Slab Beam Formwork for Concrete Casting
[Mar 09, 2026]
[Mar 09, 2026] Slab Beam Formwork for Concrete Casting Brief Introduction Slab Beam Formwork for Concrete Casting (TECON Slab Flex 20 Formwork) is the basic slab formwork mainly consisted by plywood, H20 timber beam and shoring ...
85839. Tecon Single Side Formwork Frame
[Mar 06, 2026]
[Mar 06, 2026] TECON Retaining Single Side Wall Formwork, is specially designed for single side wall projects where there's no idea to put through tie rods for anchoring. It provides a safe and stable forming solution for different ...
85840. Lianggong Q235 Tunnel Formwork Heavy Steel Formwork for Tunnel Construction
[Jan 22, 2026]
[Jan 22, 2026] Product Description Hydraulic Tunnel Lining Trolley The trolley developed by LIANGGONG which is concentrated on commonality, humanity construction. Structure reliable, convenient operation, good tunnel surface etc. ...
85841. China Customized Plastic PP Adjustable Wall Formwork for Slab/Clolumn Concrete Construction
[Dec 17, 2025]
[Dec 17, 2025] Product Description Product DescriptionS Concrete Plastic Slab Formwork Thin-walled square box,PP square box, in the cast-in-place concrete floor, there is a regular embedded internal thin-walled square box mould, so ...
85842. China Factory Customized High Quality Hydraulic Auto Climbing Formwork for High-Rise Building and ...
[Dec 16, 2025]
[Dec 16, 2025] Product Description Hydraulic Auto-climbing Formwork The power of hydraulic climbing formwork comes from the hydraulic jacking system which contains a hydraulic oil cylinder and a vertical reversing box which can ...
85843. Lianggong Concrete Material Metal Single-Side Bracket Formwork System for Wall Dam Shear/ Retaining ...
[Dec 16, 2025]
[Dec 16, 2025] Product Description Single-side Bracket Single-sided bracket is a formwork system for concrete casting of single-sided wall, characterized by its universal components, easy construction and simple and quick ...
85844. Plastic Toilets with Waste Tank out Door Toilets for Beach Parks Temperary Movable Toilets Portable ...
[Dec 11, 2025]
[Dec 11, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
85845. Brand New Adjustable Steel Telescopic Prop Acrow Prop for Scaffolding
[Jun 11, 2024]
[Jun 11, 2024] European Standard Heavy Duty Steel Prop for Shoring as the most popolar prop serie among all TECON telescopic props, is designed and manufactured according to EN1065 standard. The sizes are available from 1500mm to ...



















