Jiangsu Profile

Product List
8581. Precision Casting Investment Casting Stainless Steel Aluminum Titanium Casting Services
[Apr 08, 2026]
[Apr 08, 2026] Product Description Item Name Custom Investment Casting Services Application Machinery Parts,Hardware Accessories,Auto Parts,Heavy-Duty Truck Parts,Instrument Accessories,Automation Equipment Parts,etc Model ...
Company: Wuxi Henderchan Industrial Co Ltd
8582. Pengtai's 30kVA Oil-Immersed Distribution Transformer Is Suitable for Dual High Voltages of ...
[Apr 08, 2026]
[Apr 08, 2026] Product Description OIL IMMERSED TRANSFORMER The S11 fully sealed oil-immersed power transformer developed and produced by our company has the advantages of low loss, low noise, and high efficiency, which can ...
Company: Jiangsu Pengtai Electric Co., Ltd
8583. Lined PFA EPDM Cast Iron Steel Weir Type Diaphragm Valve Flange End
[Apr 08, 2026]
[Apr 08, 2026] Construction is as follows: Name Diaphragm Valve Structure Weir Pattern Diaphragm Valve Size 1/2"~12"; DN15~DN300 Normal pressure Class 125LB,150LB,300LB; PN10,PN16,PN25 Design standard GB/T ...
Company: Suzhou Shangheng Valve Co., Ltd.
8584. 33kv 2500kVA Oil Type Distribution Transformer for Energy Transmission Lines
[Apr 07, 2026]
[Apr 07, 2026] The adoption of IEC-standard medium-high voltage distribution transformers (typical range: 10kV-72.5kV, 500kVA-30MVA) in North America (a region historically dominated by NEMA/IEEE standards) has seen significant ...
Company: Jiangsu Daelim Electric Co., Ltd.
8585. Pad-Mounted Prefabricated Substation 15kv/25kv, 750kVA for Utility & City Distribution
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
8586. Compact Substation for Data Center 10kv/20kv 1600-2500kVA N+1 Redundancy Option
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
8587. 630kVA IEC Standard 12kv 3000kVA Compact Prefabricated Transformer Mobile Substation
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
8588. Compact Substation for Solar Farm 24kv/0.4kv, 1600kVA Pad-Mounted IP54, IEC Certified
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
8589. Modular Compact Substation 12kv 1000kVA Hv LV & Transformer in One Compact Unit
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
8590. Transformer Substation Kiosk with PLC Control 15kv 1000kVA Automated & Remotely Operated
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
8591. Outdoor Substation Transformer Kiosk 11kv/0.415kv 750kVA Complete Mv/LV Distribution Unit
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
8592. Prefabricated Substation for Renewable Energy 12kv/24kv, up to 2000kVA Smart Grid Ready
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
8593. Robust & Intelligent Substation 33kv 2000kVA for Harsh & Smart Grid Applications
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
8594. Factory Prefabricated Electrical House 11kv 1600kVA Modular, Quick Installation Transformer
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
8595. Urable Prefabricated Unit 17.5kv 1250kVA Stainless Steel Hardware Long Life Substation Transformer
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.



















