Jiangsu Profile

Product List
5146. Top Grade Strong Portable Mobile Concrete Mixer
[Mar 30, 2026]
[Mar 30, 2026] Blender Parameters Model TCM350 TCM400 TCM500 TCM600 TCM700 Motor [E] 2200w 3000w 3000w 5500w 5500w Gasoline Engine [G] 6.5hp 6.5hp 9hp 9hp 9hp Diesel Engine [D] 6hp 6hp 6hp 9hp 9hp Stirring ...
Company: Wuxi Eternal Bliss Alloy Casting & Forging Co., Ltd.
5147. Luxury Double Homestay Hotel Camping Tent Smart Manufacturing Factory
[Mar 18, 2026]
[Mar 18, 2026] Product Description Item No. T0881 Color Customized PMS Size tent size: 400x450x300cm tarp size: 500x700cm Logo Silk screen or transfer printing Flysheet 300gsm cotton PU3000mm waterproof Accessory Metal ...
5148. High-Performance Fiberglass Reinforcement for ABS, PBT, PETG Materials
[Apr 29, 2026]
[Apr 29, 2026] Product Description 1. Fiberglass Chopped strand is cut from continuous fiberglass roving which is treated with a silane coupling agent and a special sizing agent formulation. 2. This chopped glass fiber has good ...
Company: Nanjing EFG Co., Ltd.
5149. Pad-Mounted Prefabricated Substation 15kv/25kv, 750kVA for Utility & City Distribution
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5150. Compact Substation for Data Center 10kv/20kv 1600-2500kVA N+1 Redundancy Option
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5151. 630kVA IEC Standard 12kv 3000kVA Compact Prefabricated Transformer Mobile Substation
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5152. Compact Substation for Solar Farm 24kv/0.4kv, 1600kVA Pad-Mounted IP54, IEC Certified
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5153. Modular Compact Substation 12kv 1000kVA Hv LV & Transformer in One Compact Unit
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5154. Transformer Substation Kiosk with PLC Control 15kv 1000kVA Automated & Remotely Operated
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5155. Outdoor Substation Transformer Kiosk 11kv/0.415kv 750kVA Complete Mv/LV Distribution Unit
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5156. Prefabricated Substation for Renewable Energy 12kv/24kv, up to 2000kVA Smart Grid Ready
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5157. Robust & Intelligent Substation 33kv 2000kVA for Harsh & Smart Grid Applications
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5158. Urable Prefabricated Unit 17.5kv 1250kVA Stainless Steel Hardware Long Life Substation Transformer
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5159. Urban Grid Compact Substation 12kv/24kv, 500-1600kVA Space-Saving, Low Noise Design
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
5160. Intelligent Pad-Mounted Unit 24kv 1600kVA Energy Monitoring & Asset Management Transformer ...
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.



















