Jiangsu Profile

Famous Export Brand

Product List
20746. Prefabricated Modular 17.5kv 1250kVA Saves Space Reduces Installation Time Substation Transformer
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20747. All-in-One Solution Hv Transformer LV 12kv 800kVA Compact Secure & Efficient Substation
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20748. Customizable Compact Substation Voltage up to 40.5kv Capacity up to 10mva
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20749. Compact Substation Transformer Unit 12kv/0.4kv 630kVA Space-Saving & Cost-Effective
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20750. Outdoor Power 24kv 500-2000kVA Custom Voltages Available Substation Transformer
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20751. 2000kVA 2200kVA Energy Saving and Environmental Protection Transformer Substation with UL
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20752. Eco-Design Directive (EU) 2021 Compliant Substation Transformers with Reduced Environmental Impact
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20753. Compact Substation Transformers for Urban Power Networks & City Redevelopment
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20754. 16/20kv 1000kVA Oil-Immersed Substation Distribution Transformer for European Rural Grids
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20755. 1600kVA 2000kVA 4000kVA 5000kVA Compact Substation 12/24kv for Industrial & Utility Power
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20756. Pre-Assembled Substation 11kv 22kv 33kv 17.5kv 1600kVA 2500kVA 5000kVA
[Mar 13, 2026]
[Mar 13, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
20757. 3000 kVA 3500 kVA 4000 kVA Transformer Onan Cooling Oil Immersed
[Mar 11, 2026]
[Mar 11, 2026] Daelim Belefic three-phase oil-immersed small substation transformer is designed to use in the power distribution system.A substation is a component of a system that generates,transmits, and distributes ...
Company: Jiangsu Daelim Electric Co., Ltd.
20758. 5000 kVA 5500 kVA 6000 kVA 7000 kVA Transformator American Standard
[Mar 11, 2026]
[Mar 11, 2026] Daelim Belefic three-phase oil-immersed small substation transformer is designed to use in the power distribution system.A substation is a component of a system that generates,transmits, and distributes ...
Company: Jiangsu Daelim Electric Co., Ltd.
20759. 150 kVA 180 kVA 225 kVA Power Transformer High Efficiency Copper Winding
[Mar 11, 2026]
[Mar 11, 2026] Daelim Belefic three-phase oil-immersed small substation transformer is designed to use in the power distribution system.A substation is a component of a system that generates,transmits, and distributes ...
Company: Jiangsu Daelim Electric Co., Ltd.
20760. 25 Kv Power Transformer 32 Kv Power Transformers 34.5 Kv Power Transformer
[Mar 11, 2026]
[Mar 11, 2026] Daelim Belefic three-phase oil-immersed small substation transformer is designed to use in the power distribution system.A substation is a component of a system that generates,transmits, and distributes ...
Company: Jiangsu Daelim Electric Co., Ltd.



















