Made-in-china.com

Made-in-Jiangsu.com

Home » Featured Products »

Power Transmission

» Jiangsu Product List

Product List

22/0.4kv 3150kVA High Voltage Power Distribution Transformer Factory Price Utilities Renewable
Contact Now

20896.

22/0.4kv 3150kVA High Voltage Power Distribution Transformer Factory Price Utilities Renewable Open Details in New Window [Apr 07, 2026]

The adoption of IEC-standard medium-high voltage distribution transformers (typical range: 10kV-72.5kV, 500kVA-30MVA) in North America (a region historically dominated by NEMA/IEEE standards) has seen significant ...

Company: Jiangsu Daelim Electric Co., Ltd.

33kv 2500kVA Oil Type Distribution Transformer for Energy Transmission Lines
Contact Now

20897.

33kv 2500kVA Oil Type Distribution Transformer for Energy Transmission Lines Open Details in New Window [Apr 07, 2026]

The adoption of IEC-standard medium-high voltage distribution transformers (typical range: 10kV-72.5kV, 500kVA-30MVA) in North America (a region historically dominated by NEMA/IEEE standards) has seen significant ...

Company: Jiangsu Daelim Electric Co., Ltd.

Pad-Mounted Prefabricated Substation 15kv/25kv, 750kVA for Utility & City Distribution
Contact Now

20898.

Pad-Mounted Prefabricated Substation 15kv/25kv, 750kVA for Utility & City Distribution Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Compact Substation for Data Center 10kv/20kv 1600-2500kVA N+1 Redundancy Option
Contact Now

20899.

Compact Substation for Data Center 10kv/20kv 1600-2500kVA N+1 Redundancy Option Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

630kVA IEC Standard 12kv 3000kVA Compact Prefabricated Transformer Mobile Substation
Contact Now

20900.

630kVA IEC Standard 12kv 3000kVA Compact Prefabricated Transformer Mobile Substation Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Compact Substation for Solar Farm 24kv/0.4kv, 1600kVA Pad-Mounted IP54, IEC Certified
Contact Now

20901.

Compact Substation for Solar Farm 24kv/0.4kv, 1600kVA Pad-Mounted IP54, IEC Certified Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Modular Compact Substation 12kv 1000kVA Hv LV & Transformer in One Compact Unit
Contact Now

20902.

Modular Compact Substation 12kv 1000kVA Hv LV & Transformer in One Compact Unit Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Transformer Substation Kiosk with PLC Control 15kv 1000kVA Automated & Remotely Operated
Contact Now

20903.

Transformer Substation Kiosk with PLC Control 15kv 1000kVA Automated & Remotely Operated Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Outdoor Substation Transformer Kiosk 11kv/0.415kv 750kVA Complete Mv/LV Distribution Unit
Contact Now

20904.

Outdoor Substation Transformer Kiosk 11kv/0.415kv 750kVA Complete Mv/LV Distribution Unit Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Prefabricated Substation for Renewable Energy 12kv/24kv, up to 2000kVA Smart Grid Ready
Contact Now

20905.

Prefabricated Substation for Renewable Energy 12kv/24kv, up to 2000kVA Smart Grid Ready Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Robust & Intelligent Substation 33kv 2000kVA for Harsh & Smart Grid Applications
Contact Now

20906.

Robust & Intelligent Substation 33kv 2000kVA for Harsh & Smart Grid Applications Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Factory Prefabricated Electrical House 11kv 1600kVA Modular, Quick Installation Transformer
Contact Now

20907.

Factory Prefabricated Electrical House 11kv 1600kVA Modular, Quick Installation Transformer Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Urable Prefabricated Unit 17.5kv 1250kVA Stainless Steel Hardware Long Life Substation Transformer
Contact Now

20908.

Urable Prefabricated Unit 17.5kv 1250kVA Stainless Steel Hardware Long Life Substation Transformer Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Urban Grid Compact Substation 12kv/24kv, 500-1600kVA Space-Saving, Low Noise Design
Contact Now

20909.

Urban Grid Compact Substation 12kv/24kv, 500-1600kVA Space-Saving, Low Noise Design Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Intelligent Pad-Mounted Unit 24kv 1600kVA Energy Monitoring & Asset Management Transformer ...
Contact Now

20910.

Intelligent Pad-Mounted Unit 24kv 1600kVA Energy Monitoring & Asset Management Transformer ... Open Details in New Window [Apr 07, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.