Jiangsu Profile

Product List
2596. High Quality Superior Easy to Install Steel Structure Workshop for Multi-Storey Car Parking
[Apr 08, 2025]
[Apr 08, 2025] 1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular Tube (5) ...
2597. Low Cost Superior Easy to Install Steel Sheet Structure for House Office Use
[Apr 08, 2025]
[Apr 08, 2025] 1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular Tube (5) ...
2598. Light Weight Modular Prefabricated Steel Structure Building Metal Frame Warehouse Logistics Factory ...
[Apr 08, 2025]
[Apr 08, 2025] 1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular Tube (5) ...
2599. Good Quality High Rise Easy to Install Steel Office Building with Durable Design
[Apr 08, 2025]
[Apr 08, 2025] 1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular Tube (5) ...
2600. Industrial Steel Structure Building with Chinese Design Style/ Large-Span Steel Structural ...
[Apr 08, 2025]
[Apr 08, 2025] 1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular Tube (5) ...
2601. Factory Metal Space Frame Steel Structure Building Prefab Warehouse Commercial Prefabricated Steel ...
[Apr 08, 2025]
[Apr 08, 2025] 1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular Tube (5) ...
2602. Integrated Villa Building Fast Installation Luxury Prefab Houses
[Mar 12, 2025]
[Mar 12, 2025] Integrated Villa Building Fast Installation Luxury Prefab Houses Product Description Light steel structure building is a new type of building structure system, which is formed by the main steel framework linking up ...
2603. High-Quality Prefabricated Steel Structures for Power Plant Efficiency
[Jul 09, 2026]
[Jul 09, 2026] PRODUCT INTRODUCTION Power plant operation hinges on safety; steel structure ensures load-bearing strength. • Capable of withstanding wind loads and temperature extremes, our steel structure suits high-temp, ...
2604. Anti-Corrosion Earthquake Resistance Minwell China Structure Prefabricated Building Material Steel ...
[Jul 09, 2026]
[Jul 09, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...
2605. Earthquake Resistance Easy to Install Minwell Stainless Steel Factory Structures
[Jul 09, 2026]
[Jul 09, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...
2606. Support Installation Anti-Corrosion Minwell China Prefab House Steel Factory Structures
[Jul 09, 2026]
[Jul 09, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...
2607. China Earthquake Resistance Minwell Frame Prefab Building Structure Corrosion-Resistant Steel ...
[Jul 09, 2026]
[Jul 09, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...
2608. Q235B / Q355b Easy to Install Minwell China Building Steel
[Jul 09, 2026]
[Jul 09, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...
2609. Portal Frame High Intensity Minwell China Structure Building Steel Structures
[Jul 09, 2026]
[Jul 09, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...
2610. Anti-Corrosion Earthquake Resistance Minwell China Products Warehouse Steel Structures with Cheap ...
[Jul 09, 2026]
[Jul 09, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...



















