Jiangsu Profile

Product List
11056. Steel Structure Container House Container Home with Prefabricated Top and Bottom Frames for ...
[May 30, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
11057. Masterwell High Quality Automatic Aluminum Tempered Frame Sectional Steel Garage Door
[Jul 19, 2025]

Product Description Panel type Non-finger protectional panel Structure Tight tongue and groove Joint Material Galvanized steel with pu foaming Material thickness GA29/GA26 Section thickness 1 3/8’’(35mm) / 1 3/5’’(40mm) ...
Company: Master Well Enterprise Limited
11058. Factory Customized Steel Structure Bailey Bridge Prefabricated Pedestrian Steel Frame Truss Bridge
[Jul 17, 2025]

Product Description ZB321(100) truss press limited table No. internal force structure form not reinforced model reinforced model SS DS TS DDR SSR DSR TSR DDR 321(100) standard truss ...
11059. 0.9mm Thickness 304 Stainless Steel Frame Push Button PVC High Speed Door
[Jul 03, 2025]

Why more and more factories choose SEPPES industrial doors? 1. An industrial Door Brand Exported to Over 50 Countries 2. Serving Over 3600 Clients Worldwide 3. Holder of Multiple Authoritative Certifications, ...
11060. Prefab Metal Frame Steel Structure Portable Bailey Bridge Components
[May 24, 2025]

Product Description ZB321(100) truss press limited table No. internal force structure form not reinforced model reinforced model SS DS TS DDR SSR DSR TSR DDR 321(100) standard truss ...
11061. Temporary Bailey Steel Structure Bridge Modern Design with Strong Metal Frame
[May 22, 2025]

Product Description ZB200 truss press limited table NO. internal force structure form not reinforced model reinforced model SS DS TS QS SSR DSR TSR QSR 200 standard truss ...
11062. Factory Customized Portable High-Quality Low-Cost Prefabricated Residential Steel Frame Flat House ...
[Jun 16, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
11063. Compact 321 Bridge Price Steel Frame Bailey Structure Truss Bridge Components
[May 12, 2025]

Product Description ZB321(100) truss press limited table No. internal force structure form not reinforced model reinforced model SS DS TS DDR SSR DSR TSR DDR 321(100) standard truss ...
11064. Truss Frame Pedestrian Girder Bailey Steel Structure Bridge Modern Design for Construction
[May 12, 2025]

Product Description ZB321(100) truss press limited table No. internal force structure form not reinforced model reinforced model SS DS TS DDR SSR DSR TSR DDR 321(100) standard truss ...
11065. Customized Steel Structure Bailey Bridge Prefabricated Pedestrian Steel Frame Truss Bridge
[May 12, 2025]

Product Description ZB321(100) truss press limited table No. internal force structure form not reinforced model reinforced model SS DS TS DDR SSR DSR TSR DDR 321(100) standard truss ...
11066. Steel Truss Frame Pedestrian Girder Bridge Construction Design Modular Bailey Bridge
[May 12, 2025]

Product Description ZB321(100) truss press limited table No. internal force structure form not reinforced model reinforced model SS DS TS DDR SSR DSR TSR DDR 321(100) standard truss ...
11067. Low Cost Temporary Steel Frame Bridge Single High Suspension Prefabricated Modern Design
[May 07, 2025]

Product Description ZB200 truss press limited table NO. internal force structure form not reinforced model reinforced model SS DS TS QS SSR DSR TSR QSR 200 standard truss ...
11068. Lianggong Manufacture Concrete Steel Frame Formwork for Wall Solumn Slab Construction
[Apr 29, 2025]

China Lianggong Manufacture Concrete Drophead Steel Frame Slab Formwork for Construction Product Description Steel Frame Formwork System Steel frame formwork is made up of 12mm thick plywood covered with hollow ...
11069. 20FT 40FT Contemporary a-Frame Modified Container Villa Hotel Steel Sandwich Panel Material ...
[Jul 07, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
11070. Wholesale Custom Prefabricated Luxury Modular Container House with Light Steel Frame Preafb ...
[Jun 25, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
