Made-in-china.com

Made-in-Jiangsu.com

Home » Featured Products »

Steel Structure

» Jiangsu Product List

Product List

Floor Steel Deck (YX76-305-915)

18106.

Floor Steel Deck (YX76-305-915) Open Details in New Window [May 12, 2025]

1. Definition: The corrugated galvanized steel sheet(the floor steel deck )is the permanent upholding slabs used in the steel structure buildings, formed by zinc-coating steel sheet to berolled and cold bended. It is ...

Company: Jiangsu Yinhuan New material Technology Co.,Ltd

Floor Steel Deck (YX65-185-555)

18107.

Floor Steel Deck (YX65-185-555) Open Details in New Window [May 12, 2025]

1. Definition: The corrugated galvanized steel sheet(the floor steel deck )is the permanent upholding slabs used in the steel structure buildings, formed by zinc-coating steel sheet to berolled and cold bended. It is ...

Company: Jiangsu Yinhuan New material Technology Co.,Ltd

Steel Structure, Space Frame System-Market, Shopping Mall

18108.

Steel Structure, Space Frame System-Market, Shopping Mall Open Details in New Window [Aug 22, 2024]

STEEL STRUCTURE, SPACE FRAME STRUCTURE The space frame system is a kind of steel structure, which could realise the structure of large span and special shape. The steel structure was widely used in projects such as ...

Company: Xuzhou Hantang Overseas Steel Structure Engineering Co., Ltd.

Tubular Steel Structure-Stadium

18109.

Tubular Steel Structure-Stadium Open Details in New Window [Aug 20, 2024]

TUBULAR STRUCTURE is a kind of steel structure, which is connected by round steel pipes... Our company is the leading company for space frame structure in China. The Grade A enterprise of steel structure and space ...

Company: Xuzhou Hantang Overseas Steel Structure Engineering Co., Ltd.

Top quality High Density PU Edge Wall Panels with Fireproof Rock Wool Core for Steel Structures

18110.

Top quality High Density PU Edge Wall Panels with Fireproof Rock Wool Core for Steel Structures Open Details in New Window [Jul 22, 2024]

Unveiling Our Product's Competitive Edge: 1. Eco-Friendly Innovation: Our panels are meticulously designed to release no formaldehyde, ensuring your environment is as green and safe as possible. 2. Superior Energy ...

Company: Wuxi Shengming Green Building Materials Co., Ltd.

Highway Guardrail for Road Crash Barrier

18111.

Highway Guardrail for Road Crash Barrier Open Details in New Window [Nov 03, 2020]

highway guardrail post C channel post for road crash barrier C channel post for road crash barrier highway guardrail is used to mounting alongside the road,highway to protect vehicles when crash happened.it is ...

Company: Jiangsu Guoqiang Singsun Energy Co., Ltd.

Sheet Pile M Profile Cold Formed 900X400

18112.

Sheet Pile M Profile Cold Formed 900X400 Open Details in New Window [Apr 29, 2020]

sheet pile M profile cold formed 900x400 M profile sheet pile cold formed 900x400 joint venture with Nippon Steel, with their tech,we could do one of the largest effective width of 900mm as a singlar sheet ...

Company: Jiangsu Guoqiang Singsun Energy Co., Ltd.

Q235B Galvanized C Channel Steel with 6m Length

18113.

Q235B Galvanized C Channel Steel with 6m Length Open Details in New Window [Nov 03, 2020]

steel structures We have strong ability in making all kinds of steel frame structures. These products are widely used steel structures hot dipped galvanized We have strong ability in making all kinds of steel ...

Company: Jiangsu Guoqiang Singsun Energy Co., Ltd.

M Profile Sheet Pile Cold Formed 900X400

18114.

M Profile Sheet Pile Cold Formed 900X400 Open Details in New Window [Oct 12, 2020]

sheet pile M profile cold formed 900x400 M profile sheet pile cold formed 900x400 joint venture with Nippon Steel, with their tech,we could do one of the largest effective width of 900mm as a singlar sheet pile.

Company: Jiangsu Guoqiang Singsun Energy Co., Ltd.

Sheet Pile as Railway 900X400

18115.

Sheet Pile as Railway 900X400 Open Details in New Window [Jul 24, 2020]

sheet pile M profile cold formed 900x400 M profile sheet pile cold formed 900x400 joint venture with Nippon Steel, with their tech,we could do one of the largest effective width of 900mm as a singlar sheet pile.

Company: Jiangsu Guoqiang Singsun Energy Co., Ltd.

Acoustic Door; Sound Proof Door

18116.

Acoustic Door; Sound Proof Door Open Details in New Window [Mar 29, 2025]

For the steel door, we adopt high-quality galvanized steel plate /304 stainless steel plate, the thickness of the door frame steel plate is 1.5mm, the thickness of the door plate is 0.8mm/1.0mm, the thickness of the ...

Company: Suzhou Link Shield Technology Co., Ltd.

Fire Door

18117.

Fire Door Open Details in New Window [Mar 29, 2025]

For the steel door, we adopt high-quality galvanized steel plate /304 stainless steel plate, the thickness of the door frame steel plate is 1.5mm, the thickness of the door plate is 0.8mm/1.0mm, the thickness of the ...

Company: Suzhou Link Shield Technology Co., Ltd.

Steel Oversize Door

18118.

Steel Oversize Door Open Details in New Window [Mar 29, 2025]

For the steel door, we adopt high-quality galvanized steel plate /304 stainless steel plate, the thickness of the door frame steel plate is 1.5mm, the thickness of the door plate is 0.8mm/1.0mm, the thickness of the ...

Company: Suzhou Link Shield Technology Co., Ltd.

Steel Structure Container House Container Home with Prefabricated Top and Bottom Frames for ...
Contact Now

18119.

Steel Structure Container House Container Home with Prefabricated Top and Bottom Frames for ... Open Details in New Window [May 30, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.

20 FT Expandable Container House Prefabricated-Building House Modular House Steel Structure Mini ...
Contact Now

18120.

20 FT Expandable Container House Prefabricated-Building House Modular House Steel Structure Mini ... Open Details in New Window [May 08, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.