Jiangsu Profile

Product List
1306. Reliable and Stable Power Plant Steel Structure
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Power plant operation, safety as the foundation; structural load-bearing, steel as the soul. • The steel structure main body can withstand wind loads and temperature differences, is suitable for the ...
1307. Good Quality Multi-Layer Steel Structure Products
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Core Advantages and Features The multi-layer steel structure building is constructed with high-strength steel as the core framework, achieving safety standards of ≥8 degrees for earthquake ...
1308. 80% Prefabricated Steel Structures for Efficient Power Plant Installation
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Power plant operation hinges on safety; steel structure ensures load-bearing strength. • Capable of withstanding wind loads and temperature extremes, our steel structure suits high-temp, ...
1309. Durable Steel Structures for Power Plant Construction and Maintenance
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Power plant operation, safety as the foundation; structural load-bearing, steel as the soul. • The steel structure main body can withstand wind loads and temperature differences, is suitable for the ...
1310. Novel Multi-Storey Steel Structure Products
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Core Advantages and Features The multi-layer steel structure building is constructed with high-strength steel as the core framework, achieving safety standards of ≥8 degrees for earthquake ...
1311. Durable Steel Structure for Multi-Purpose Sports Halls and Facilities
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Structural Characteristics • Large-span Space: The high strength of steel allows for large spans, meeting the need for open spaces in stadiums. For example, the Bai Lu Stadium of Xiamen Olympic ...
1312. High-Quality Steel Workshop Structures Ensuring Longevity and Dependability
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short period: Factory prefabrication and on-site assembly, 30%-50% faster than concrete. A 300m2 factory can be ...
1313. Energy-Efficient Steel Structures for Modern Factory Building Solutions
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High efficiency, quick commissioning Short construction: Prefabrication and assembly, 30%-50% faster than concrete. 300m2 built by 5 workers in 30 days. Less weather ...
1314. High-Quality Steel Structure Factory for Global Distribution Needs
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Power plant operation, safety as the foundation; structural load-bearing, steel as the soul. • The steel structure main body can withstand wind loads and temperature differences, is suitable for the ...
1315. Enduring Steel Structure for Modern Office Buildings in China
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Core Advantages and Features Environmental Protection, Energy Saving and Sustainability The steel structure office building uses 100% recyclable steel, significantly reducing construction waste and ...
1316. Long-Lasting Durable Steel Structures for Efficient Workshop Solutions
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than concrete structures. A ...
1317. Reliable H Beam Steel Structures for Energy-Efficient Factory Construction
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...
1318. High-Quality Steel Structures for Sustainable Plant Development Projects
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High efficiency, quick commissioning Short period: Factory prefabrication and on-site assembly, 30%-50% faster than concrete structures. A 300m2 factory building can ...
1319. Bim-Assembled Power Plant Steel Structures with 2mm Installation Accuracy
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Power plant operation, safety as the foundation; structural load-bearing, steel as the soul. • The steel structure main body can withstand wind loads and temperature differences, is suitable for the ...
1320. Sturdy and Reliable Marine Steel Structure Products
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION The marine steel structure possesses characteristics such as corrosion resistance, wind resistance, and adaptability to complex marine environments. • Utilizing marine-grade weather-resistant steel ...



















