Jiangsu Profile

Product List
5566. Kya-X50 High Speed Wire Nail Making Machine for Making Nails
[Aug 01, 2023]

High Speed Nail Making Machine KYA-X50 -- 1pcs high speed nail making machine -- 1pcs controller -- 1pcs active wire pay-off stand (Max load:1.2--1.5 tons) -- High productive: 760pcs/min -- Defective rate: No ...
Company: Changzhou Kya Trading Co., Ltd.
5567. High Temperature PTFE Coated Fiberglass Fabric for Silicone Adhesive Tape
[Jul 04, 2023]

China Supply High Temperature Resistance PTFE fiberglass self adhesive Tape PTFE fiberglass adhesive fabric /cloth is made from PTFE cloth (or pure PTFE film), treated with sodium or special reagent on one side, then ...
5568. MTB Electric Mountain Bike for Europe Market 36V250W with Big Capacity Battery
[May 29, 2025]

Product Description ITEM DESCRIPTION BATTERY 36V13Ah lithium battery MOTOR POWER 36V250W rear drive motor with disc brake CONTROLLER 36V15A brushless controller CHARGER 36V smart battery ...
Company: Aigeni Technology Co., Ltd.
5569. Easy Folding 40 FT 20 FT Prefab Container Expandable House Light Steel Folding Prefabricated Home ...
[May 08, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
5570. Packaging Machine Blade Cutting Serrated Knife for Food Packaging Bag
[Jul 10, 2024]

Product Description Packaging Machinery Serrated Cutting Blades Box sealing machine blade is mainly used for carton sealing and packaging. It can be used in a single box operation or with the assembly line. ...
5571. Quick-Build Folding Prefab Cabin Kit 20FT 40FT Prefabricated Folding Container House Prefab House ...
[May 08, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
5572. Jwell New Energy Eco-Friendly Lithium Battery PP Separator Film Coating Production Machine Line ...
[Mar 28, 2025]

Introduction Lithium Battery Separator Coating Equipment Features 1. High-Grade Alloy Steel Wall Panels: The equipment adopts high-grade alloy steel wall panels, providing excellent stability, corrosion ...
5573. Fast Install Two Storey Prefab Container House with Bathroom and Kitchen
[Mar 04, 2025]

Product Description Size 3*6m Steel Structure Bending steel plate Wall Panel 50/75/100mm EPS sandwich panel /rock wool sandwich panel,0.326/0.376/0.426/0.476mm steel sheet Glass wool panel Wall Color Grey ...
Company: Hig Housing Tech Co., Ltd.
5574. 2500 Drum Type Twister Machine for Cable Laying and Twisting
[Jun 30, 2024]

JPD-2500 Drum Type Twister Laying Up Machine 1. Application: This advanced machine excels in cabling large-section and long-length power cables, as well as high voltage or extra high voltage Milliken conductors. It ...
Company: SUZHOU HIGH LAND MACHINERY CO., LTD.
5575. Heavy Duty Cable Laying Machine Jpd-3150 Drum Type Twister
[Jun 29, 2024]

Cable Laying up Machine JPD-3150 Drum type Twister 1. Application: This robust machine is primarily designed for cabling large-section and long-length power and communication cables. It is adept at stranding high ...
Company: SUZHOU HIGH LAND MACHINERY CO., LTD.
5576. Suitable for Outdoor Residential Easy Assemble Steel Structure Casas Modular House
[Jun 20, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
5577. Modern Flat Packaging Prefabricated Steel Double-Layer Container House, Double-Layer Residential ...
[Mar 20, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
5578. 110V 220V to 9V 12V Pin Ei4115 Magnetic Core Low Frequency Transformer
[Dec 30, 2024]

Product Description The EI low-frequency transformer adopts high-quality silicon steel core, flame-retardant bobbin, temperature resistant electronic wire, and flame-retardant tape, with a simple overall structure ...
5579. Steel Structure Well-Decorated Luxury Prefab Container House Easy Installed Container House for Sale
[May 30, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
5580. Steel Structure Container House Container Home with Prefabricated Top and Bottom Frames for ...
[May 30, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
