Jiangsu Profile

Product List
9556. High Voltage Grounding Cable Braided Shielded Cable Tin Plated Copper PVC Flexible Copper Bare ...
[Mar 06, 2026]
[Mar 06, 2026] Product Description Our Flexible Connector Copper Wire Braided Cables are engineered for high flexibility, excellent conductivity, and long service life. Made from tinned or bare copper wire strands, these connectors ...
Company: Comflex Industrial Co., Ltd.
9557. Tin Plated Flat Braided Grounding Strap for Automotive Engine, Gearbox, Battery, Grounding Lead ...
[Mar 06, 2026]
[Mar 06, 2026] Product Description Our Flexible Connector Copper Wire Braided Cables are engineered for high flexibility, excellent conductivity, and long service life. Made from tinned or bare copper wire strands, these connectors ...
Company: Comflex Industrial Co., Ltd.
9558. High Quality Rewinding Shafts for BOPP Tape Slitting Machine
[Mar 03, 2026]
[Mar 03, 2026] Application: Used in the slitting process of coiled materials such as BOPP films and packaging tapes, to slit large mother rolls into small finished rolls of specified width. Features: A.Efficient winding: ...
9559. PE Bag Self-Adhesive Labeling Machine
[Mar 02, 2026]
[Mar 02, 2026] Product Description A labeling machine is a device that uses glue to stick paper or metal foil labels onto packaging containers.A flat surface labeling machine can automatically label both the front and back sides of ...
9560. Fully Automatic Flat Labeling Machine
[Mar 02, 2026]
[Mar 02, 2026] Product Description A labeling machine is a device that uses glue to stick paper or metal foil labels onto packaging containers.A flat surface labeling machine can automatically label both the front and back sides of ...
9561. Easy to Install Portable Foldable Container Houses Instant Assemble House
[Mar 01, 2026]
[Mar 01, 2026] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9562. Modern Design Prefabricated 20 Feet Folding Container House
[Mar 01, 2026]
[Mar 01, 2026] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9563. Foldable Container House with Stairs Folding Container House Prefabricated
[Mar 01, 2026]
[Mar 01, 2026] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9564. Living Folding Damp-Proof Container House Folding Tiny House Fireproof Home
[Mar 01, 2026]
[Mar 01, 2026] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9565. 20FT Office Foldable Container House Factory Sells Well Wholesale Expandable Prefabricated Houses
[Mar 01, 2026]
[Mar 01, 2026] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9566. Mobile Fold out China Folding Container House, Homes Foldable Container House
[Mar 01, 2026]
[Mar 01, 2026] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9567. Fold up Prefabricated Steel Tiny Houses Accommodation Garage
[Mar 01, 2026]
[Mar 01, 2026] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9568. Prefab Villa Hotel Luxury Container House Prefabricated 2 Story 3bedroom Modular Steel Structure ...
[Feb 25, 2026]
[Feb 25, 2026] Product Description Size 3*6m Steel Structure Bending steel plate Wall Panel 50/75/100mm EPS sandwich panel /rock wool sandwich panel,0.326/0.376/0.426/0.476mm steel sheet Glass wool panel Wall Color Grey ...
Company: Hig Housing Tech Co., Ltd.
9569. Heavy Duty Automatic Custom 40/50mm PU Sandwich Panel Sectional Door with Pedestrian Door
[Feb 25, 2026]
[Feb 25, 2026] Product Description SEPPES Sectional Door Industrial sectional doors are handy for different buildings as they can be used indoors and outdoors. They are powered through a complete operating system which includes and is ...
9570. Smooth Operating Automatic Overhead Lifting Industrial Warehouse Sectional Door for Commercial and ...
[Feb 25, 2026]
[Feb 25, 2026] Product Description SEPPES Sectional Door Industrial sectional doors are handy for different buildings as they can be used indoors and outdoors. They are powered through a complete operating system which includes and is ...



















