Made-in-china.com

Made-in-Jiangsu.com

Home » Featured Products »

Steel Tape

» Jiangsu Product List

Product List

Jiangnan Underground Cable High Voltage Suppliers 400mm 1000mm 22kv 60kv 150kv 300kv Copper Cable
Contact Now

10756.

Jiangnan Underground Cable High Voltage Suppliers 400mm 1000mm 22kv 60kv 150kv 300kv Copper Cable Open Details in New Window [Dec 01, 2025]

Conductor Aluminum or Copper Armoured SWA(Steel Wire Armoured) / STA(Steel Tape Armoured) or Non-Armoured Insulation PVC/XLPE/Fire Resistant Section Area 25mm2-630mm2 Cores 1,3,4,5 Standard IEC 60502, BS ...

Company: Wuxi Jiangnan Cable Co., Ltd

Suborui 40-300mm Holes Cutting Tool Simple Adjustment Twin Blade ABS Dust Cover Adjustable Hole Saw ...
Contact Now

10757.

Suborui 40-300mm Holes Cutting Tool Simple Adjustment Twin Blade ABS Dust Cover Adjustable Hole Saw ... Open Details in New Window [Nov 26, 2025]

Product Description ITEM 40-300mm Max Diameter 300mm Min Diameter 40mm Cutting Depth 35mm Case Size 41X13.5x41CM Weight 3.7kg Specifications ·Cutting Hole Diameter:40mm-300 mm ·Cutting Depth:35 mm ·Dust Shield ...

Company: Jiangsu Borui Tools Co., Ltd.

Prefab Folding Prefabricated Container Homes for Sale Collapsible Foldable Tiny House Folding ...
Contact Now

10758.

Prefab Folding Prefabricated Container Homes for Sale Collapsible Foldable Tiny House Folding ... Open Details in New Window [Nov 25, 2025]

Product Description Opening size L*W*H 5800*2438*2620mm Length Inner length /external length: 5.80m/5.90m Width Inner width /external width: 2.3m/2.50m Height Inner height/external height: ...

Company: Hig Housing Tech Co., Ltd.

Steel Frame Sandwich Panel Fast Assemble Modular Prefabricated House Foldable Expandable Prefab ...
Contact Now

10759.

Steel Frame Sandwich Panel Fast Assemble Modular Prefabricated House Foldable Expandable Prefab ... Open Details in New Window [Nov 24, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.

Fireproof Folding Portable Container House 20FT 40FT Easy Assemble Folding Container Homes for Sale
Contact Now

10760.

Fireproof Folding Portable Container House 20FT 40FT Easy Assemble Folding Container Homes for Sale Open Details in New Window [Nov 24, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.

Factory Direct Supply Modular House Australia Tiny Home Prefab Steel 2 Bedroom Container House ...
Contact Now

10761.

Factory Direct Supply Modular House Australia Tiny Home Prefab Steel 2 Bedroom Container House ... Open Details in New Window [Nov 24, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.

Insulation Prefabricated Folding Storage Container House Quick Build Prefab Container Mobile ...
Contact Now

10762.

Insulation Prefabricated Folding Storage Container House Quick Build Prefab Container Mobile ... Open Details in New Window [Nov 24, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.

Modern Tiny Homes Modular Container Prefab Houses for Sale Good Quality Easy Assemble Ready to Live
Contact Now

10763.

Modern Tiny Homes Modular Container Prefab Houses for Sale Good Quality Easy Assemble Ready to Live Open Details in New Window [Nov 24, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.

Pre Made Container Homes Construction House Prefabricated Ship to USA Office Building Container
Contact Now

10764.

Pre Made Container Homes Construction House Prefabricated Ship to USA Office Building Container Open Details in New Window [Nov 24, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.

Chinese Factory 3D Design for Easy Assembly, Mobile Prefabricated Houses, Foldable Container ...
Contact Now

10765.

Chinese Factory 3D Design for Easy Assembly, Mobile Prefabricated Houses, Foldable Container ... Open Details in New Window [Nov 24, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.

Container Houses 40 Feet Luxury Foldout Container Classroom Houses for Sale in Dubai
Contact Now

10766.

Container Houses 40 Feet Luxury Foldout Container Classroom Houses for Sale in Dubai Open Details in New Window [Nov 24, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.

Customized Folding Container Houses for High-Quality Residential Buildings Are The Best-Selling ...
Contact Now

10767.

Customized Folding Container Houses for High-Quality Residential Buildings Are The Best-Selling ... Open Details in New Window [Nov 24, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...

Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.

Container Homes Prefab Steel Frame K House Kit Container House Movable Prefabricated House Low Cost ...
Contact Now

10768.

Container Homes Prefab Steel Frame K House Kit Container House Movable Prefabricated House Low Cost ... Open Details in New Window [Nov 24, 2025]

Product Description Size 3*6m Steel Structure Bending steel plate Wall Panel 50/75/100mm EPS sandwich panel /rock wool sandwich panel,0.326/0.376/0.426/0.476mm steel sheet Glass wool panel Wall Color Grey ...

Company: Hig Housing Tech Co., Ltd.

Multi-Headigbt High Frequency Annealing Furnace for Metal Tube/Bar
Contact Now

10769.

Multi-Headigbt High Frequency Annealing Furnace for Metal Tube/Bar Open Details in New Window [Nov 20, 2025]

Aluminum and Aluminum Alloy Melting Furnace. 1.Description: The furnace mainly uses aluminum ingots, recovery materials, recycled materials and others as raw materials. It can produce aluminum rod (1 series, 3 ...

Company: JIANGSU RELIABLE INDUSTRY CO., LTD.

Multi-Headcu/Al Wire Breakdown Annealing Furnace with Online Annealing
Contact Now

10770.

Multi-Headcu/Al Wire Breakdown Annealing Furnace with Online Annealing Open Details in New Window [Nov 20, 2025]

Aluminum and Aluminum Alloy Melting Furnace. 1.Description: The furnace mainly uses aluminum ingots, recovery materials, recycled materials and others as raw materials. It can produce aluminum rod (1 series, 3 ...

Company: JIANGSU RELIABLE INDUSTRY CO., LTD.