Made-in-china.com

Made-in-Jiangsu.com

Home » Featured Products »

Transformer

» Jiangsu Product List

Product List

Industrial Plant Power Substation 35kv, 2000-5000kVA Heavy-Duty, High Reliability
Contact Now

63391.

Industrial Plant Power Substation 35kv, 2000-5000kVA Heavy-Duty, High Reliability Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Secondary Unit Substation for Cities 24kv 800kVA Aesthetic & Tamper-Proof Enclosure
Contact Now

63392.

Secondary Unit Substation for Cities 24kv 800kVA Aesthetic & Tamper-Proof Enclosure Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Solar PV Compact Substation 12kv, 1000-1600kVA Low Loss Transformer, Outdoor Type
Contact Now

63393.

Solar PV Compact Substation 12kv, 1000-1600kVA Low Loss Transformer, Outdoor Type Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Wind Farm Substation 36.75kv/0.69kv, 2500kVA Compact & Corrosion Resistant Design
Contact Now

63394.

Wind Farm Substation 36.75kv/0.69kv, 2500kVA Compact & Corrosion Resistant Design Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

1000kVA 2500kVA 3500kVA 5000kVA Three Phase Europe Prefabricated Substation Manufacturers
Contact Now

63395.

1000kVA 2500kVA 3500kVA 5000kVA Three Phase Europe Prefabricated Substation Manufacturers Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

250kVA IEC60076 Standard 1250kVA Primary and Secondary Compact Prefabricated Substation Australia
Contact Now

63396.

250kVA IEC60076 Standard 1250kVA Primary and Secondary Compact Prefabricated Substation Australia Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

12/ 100-800kVA Electricity Power Box-Type Prefabricated Transformer Kiosk Substations Manufacturer
Contact Now

63397.

12/ 100-800kVA Electricity Power Box-Type Prefabricated Transformer Kiosk Substations Manufacturer Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

15kv to 400V 1250kVA Prefabricated Substation with Oil Immersed Distribution Transformer
Contact Now

63398.

15kv to 400V 1250kVA Prefabricated Substation with Oil Immersed Distribution Transformer Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Transformer European Box-Type Transformer Substation E-House Ybm-12/0.4 /100kVA Prefabricated ...
Contact Now

63399.

Transformer European Box-Type Transformer Substation E-House Ybm-12/0.4 /100kVA Prefabricated ... Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

1000kVA 11kv 400V Electricity Power Box-Type Prefabricated Transformer Kiosk Substations ...
Contact Now

63400.

1000kVA 11kv 400V Electricity Power Box-Type Prefabricated Transformer Kiosk Substations ... Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

100-800kVA 11kv 400V Electricity Power Box-Type Prefabricated Transformer Kiosk Substations ...
Contact Now

63401.

100-800kVA 11kv 400V Electricity Power Box-Type Prefabricated Transformer Kiosk Substations ... Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

800kVA 11kv 400V Electricity Power Box-Type Prefabricated Transformer Kiosk Substations Manufacturer
Contact Now

63402.

800kVA 11kv 400V Electricity Power Box-Type Prefabricated Transformer Kiosk Substations Manufacturer Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Effective 3500 kVA Green Power Transmission Transformer Mobile Box-Type Substation
Contact Now

63403.

Effective 3500 kVA Green Power Transmission Transformer Mobile Box-Type Substation Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

800kVA 1000kVA Transformer Substation Pad Mounted Substation
Contact Now

63404.

800kVA 1000kVA Transformer Substation Pad Mounted Substation Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

275 Kv 500 Mva IEC-Certified High Voltage Power Transformer on-Load Tap Changer
Contact Now

63405.

275 Kv 500 Mva IEC-Certified High Voltage Power Transformer on-Load Tap Changer Open Details in New Window [Oct 29, 2025]

1. CertificationsDaelim is a professional transformer manufacturer and supplier. Various international standards can be customized for your transformer, such as: IEEE/ANSI, AS/NZS, IEC, EN 60076, GOST, etc.Daelim ...

Company: Jiangsu Daelim Electric Co., Ltd.