Jiangsu Profile

Product List
2206. Weatherproof Steel Kiosk 12kv 500-2000kVA IP55 UV Resistant Outdoor Substation Transformer Use
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2207. Digital Substation Kiosk 12kv 800kVA Featuring Condition Monitoring & Alarms
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2208. All-in-One Electrical Kiosk 36kv 1600kVA Pre-Assembled Minimal Site Work Substation Transformer
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2209. Compact Secondary Substation 12kv/0.4kv 630kVA Ultra-Compact Footprint
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2210. Plug-and-Play Substation Module 24kv 1250kVA Fast Deployment Scalable Design
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2211. Oil & Gas Industry Substation 13.8kv 2000kVA Ex-Proof Options Available
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2212. Mining Industry Power Unit 33kv 3150kVA Reinforced & Ventilated Design Substation Transformer
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2213. Industrial Plant Power Substation 35kv, 2000-5000kVA Heavy-Duty, High Reliability
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2214. Secondary Unit Substation for Cities 24kv 800kVA Aesthetic & Tamper-Proof Enclosure
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2215. Solar PV Compact Substation 12kv, 1000-1600kVA Low Loss Transformer, Outdoor Type
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2216. Wind Farm Substation 36.75kv/0.69kv, 2500kVA Compact & Corrosion Resistant Design
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2217. 1000kVA 2500kVA 3500kVA 5000kVA Three Phase Europe Prefabricated Substation Manufacturers
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2218. High-Voltage/Low-Voltage 2/0.4kv Mobile Outdoor Prefabricated Transformer Substation 10/15/20K
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2219. 250kVA IEC60076 Standard 1250kVA Primary and Secondary Compact Prefabricated Substation Australia
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
2220. One-Piece Molding 6 Layer Insulated Food Transport Trolley for Chain Store Supply
[Jan 22, 2026]
[Jan 22, 2026] Product Description UTILITY CART Streamline your baking operations with this commercial-grade 6-tier bakery cart designed specifically for professional bakers and pastry chefs. This heavy-duty rolling bakery ...
Company: Jiangsu T-Shine Bakeware Co., Ltd.



















